Showing posts with label Power Management. Show all posts
Showing posts with label Power Management. Show all posts

Tuesday, January 27, 2009

Energy Management is a systems problem

Point-optimization alone will not fully minimize a data center's energy consumption. Rather, optimization is a "systems" problem, where all individual components, and their dynamics, have to be optimized together and usually continuously.

Probably the leading company in this space -- as-of today -- is Cisco. They recently announced plans to launch "Energywise" software for certain lines of switches. This software will intelligently manage energy consumption of devices, much the way laptops shut down subsystems when on battery, and the way PC power consumption is managed by companies like Verdiem and 1E. Driving this at Cisco are leaders like Paul Marcoux, who's been focused on these efforts for years. Others driving these moves include Robert Aldrich, also at Cisco, and frequent evangelist/blogger

Now granted, these solutions are "point" solutions... But Cisco went a step further today by acquiring privately-held Richards-Zeta. Take a gander:
Richards-Zeta's intelligent middleware transforms building operational data into an IT-friendly format that easily integrates with existing applications. Its scalable, open platform enables the convergence of building systems onto an IP network. This integrated solution provides more effective management of energy consumption across an organization.

Richards-Zeta's technologies will support innovative Cisco customer solutions such as Cisco Connected Real Estate and Cisco EnergyWise. EnergyWise, launched today in Barcelona, Spain, is a technology for Cisco Catalyst Switches that proactively measures, reports and reduces the energy consumption of IP devices such as phones, laptops and access points. Ultimately, Richards-Zeta's technology is expected to work together with EnergyWise and industry partner solutions to enable the management of power consumption for building and IT infrastructure.
This is clearly a play at looking at measuring and optimizing the data center's power & cooling as a system embedded in the larger building/facility.

The other big players in this game, but with much less experience in IT, are APC/Schneider Electric, as well as Emerson -- both known for their dominance in power distribution and cooling, respectively. But each has made bold moves into the others' space over the past years. For example, Aperture (a leader in data center measurement software) was acquired by Emerson last year. And APC is expanding its Infrastruxure line of cooling, enclosure and power management systems. Finally, look for advanced pure-play measurement, monitoring and analysis players like SynapSense to be cutting even more deals as the race to measure and control data center efficiency heats up.

Now, what's the holy grail? Conversations I've had with many of these vendors have yielded a number of practical examples:
  • As data center compute load falls (e.g. during evenings & weekends) servers are automatically consolidated, and unused machines are powered-down or hibernated. In concert, CRAC units, chillers and PDUs are also shut-down or re-configured to save power
  • When a "hot spot" in a data center is detected, either point-cooling is activated, or some of he workload is physically migrated to a server in a cooler area elsewhere in the data center
  • If one electric phase of power on a PDU is out-of-balance (drawing too much current) workloads running on servers on that phase can be migrated to servers on a different phase
  • Should a facility's power or cooling system partially fail, compute workloads can be temporarily minimized or migrated elsewhere temporarily
While most of these visions are pretty-well beyond what data center managers are worrying about today, I would expect to see products begin to evolve in this direction, particularly for larger facilities. I would also expect to see some blurring of the lines (as is already happening) between traditional facilities management firms and IT operations/management firms. They are finding an important interrelationship between IT operations and building facilities organizations/buyers -- and the important systems interrelationships as well.

Wednesday, November 5, 2008

The art of powering-down servers

I was pretty happy to see that Ted Samson of Infoworld wrote a really well-balanced analysis of the advantages (and calculated risks) of using server power management in the data center.

Besides speaking with leading SW companies in the space like Cassatt, he also pinged authorities at HP, IBM and Sun, who all had thoughtful positions on the merits of powering servers on/off based on their usage (and when they were idle). He also spoke with Robert Aldrich of Cisco Systems -- who pointed out that they are already using power management quite extensively internally, with no ill-effects. BTW, Robert pointed out that servers at Cisco use 40% of their power when idle. Most analyses I've seen show that the number is closer to 60%-80%. Good for them.

What's also fascinating about Ted's post are the comments. Most are quite supportive of power management, with a realization that future, denser data centers will need this -- and that some power companies have already figured-out that dynamic "load management" is one of the most intelligent operational innovations available today.

Tuesday, October 21, 2008

Gartner on Green Data Center Recommendations

Gartner Research just issued a very telling release on taking a holistic view of energy-efficient data centers, rather than a narrow point-technology view. Gartner compared the data center to a "living organism" in terms of how it needs to be treated as a dynamic mechanism. (BTW, I owe a head nod to Dave O's GreenM3 blog for coining the term "the living data center")

Said Rakesh Kumar, a research vice president at Gartner,
“If ‘greening’ the data centre is the goal, power efficiency is the starting point but not sufficient on its own... Green’ requires an end-to-end, integrated view of the data centre, including the building, energy efficiency, waste management, asset management, capacity management, technology architecture, support services, energy sources and operations.”
“Data centre managers need to think differently about their data centres. Tomorrow’s data centre is moving from being static to becoming a living organism, where modelling and measuring tools will become one of the major elements of its management,” said Mr Kumar. “It will be dynamic and address a variety of technical, financial and environmental demands, and modular to respond quickly to demands for floor space. In addition, it will need to have some degree of flexibility, to run workloads where energy is cheapest and above all be highly-available, with 99.999 per cent availability.”
I like this analysis because it implies a dynamic "utility computing" style data center where workloads can be moved, servers can be repurposed, and capacity is always matched to demand. This is the ideal approach to ensuring constant efficiency.

The release also had six recommendations; Here's the one I like the most:
6. Manage the server efficiencies. Move away from the ‘always on’ mentality and look at powering equipment down
To me, it sounds like technologies like Active Power management are finally getting traction; and, it seems that power management is being validated -- especially in environments with very highly cyclical workloads. (most recently endorsed in a 451 Group report, as well by a host of vendors).

Especially with the economy in a spin, and margins being tightened, look for more ideas for increasing the $ efficiency of data center assets.

Tuesday, September 2, 2008

Efficient IT and Power Management

I just learned of a brand-new analyst report (and upcoming webinar) regarding a broad survey of desktop and server power management. I expect that it will completely dwarf the very high-level survey of data center power management products I recently made.

The work is being done by The 451 Group, and sister company Tier 1 Research. The webinar, titled "Power Management 2008-2012 Managing and Monitoring IT Energy Use From the Desktop to the Datacenter" is on September 4 from 12:00 to 1:00pm EST. Register Here.

The webinar appears to coincide with a forthcoming 76 page report from The 451 titled "Eco-Efficient IT: Power Management – 2008-2012". Clearly, Cassatt is part of their wide-ranging analysis. Their summary:
"IT power consumption is causing significant financial, operational and ethical problems for many organizations – and excessive consumption may in future be a compliance issue (accurate measurement of power is required by some planned laws and incentive schemes). However, most organizations have no technology in place for measuring, aggregating and tracking power use; indeed, such technology has only recently become available. IT suppliers have belatedly realized the importance of this issue, and the race is on to develop products and establish them in the marketplace.

"This report examines this topic with a focus on managing power, managing datacenters and investing in and understanding the eco-efficient IT agenda.

"The 451 Eco-Efficient IT (ECO-IT) service tracks and analyzes key developments, from the Kyoto Protocol to datacenter effectiveness, from electricity prices to telepresence. Ecoefficiency is becoming a key consideration for technology vendors, end users, service providers and investors. The 451 Group provides insight to help organizations negotiate this new challenge and profit from the opportunity.
I'm digging the report, simply b/c of the TOC - something everyone should consider reading before undertaking *any* form of IT energy efficiency project:
SECTION 4: Datacenter power management
4.1 Datacenter power management – The technology
4.2 Effectiveness and ROI of datacenter power management
4.2.1 Calculating ROI
4.3 Market development and buyer attitudes
4.4 Reasons to be cautious: Market barriers to datacenter power management adoption
4.5 Toward the energy-aware, dynamic datacenter
4.5.1 The power management policy engine
4.6 Visibility into IT assets, dependencies and policies
4.7 Improving visibility into mechanical and electrical equipment
4.8 Virtualization and power management
4.9 Technical issues associated with virtualization
Like virtualization, power management is not an end-in-and-of-itself. Rather, it should be considered as part of a portfolio of initiatives IT & Facilities management need to consider when considering options.

I'm planning a future post to cover my philosophy of what a truly operationally-efficient data center implies; stay tuned.

Wednesday, August 27, 2008

Power IT Down Day

Today (Aug. 27th) is "Power IT down day".... a marketing/awareness-building event by HP, Intel and Citrix to promote installing and activating PC power management software. By doing so, companies can reduce power during off-hours and weekends.

Little do they know, this is both (a) a great idea, and (b) missing-the-boat on a huge additional opportunity.

Here's why: the event is definitely a great move to build awareness that IT doesn't need to be on 100% of the time... this is just a myth. And shutting down a PC/monitor overnight can save close to 200W. But the messaging the initiative is missing is that this doesn't need to be confined to desktops and monitors. Data Center Servers, the most power-hungry (and wasteful) equipment can be turned off, too.

At the time of this writing, the official website at HP showed over 2,700 participants, saving an estimated 35,000 KWh. But here's a sobering statistic: At a recent Silicon Valley Leadership Group Energy Summit, Cassatt piloted Server power management software. The organization using the software operated a number of its own data centers -- and the case study findings showed that if this software were used enterprise-wide, the annual savings could be 9,100KWh for this enterprise alone.

Maybe we'll try to expand the scope of Turn IT Off Day in 2009...

Tuesday, August 26, 2008

A day with the California ISO

Earlier today I was able to spend time with folks at the California Independent System Operator (ISO). This organization literally operates California's power grid, ensuring that supply meets demand, and that problems get worked-around seamlessly. They also work with utilities, public policy makers and technology providers to promote solutions that permanently (as well as on-demand) reduce electrical load on the power grid.
I got a tour of their demonstration lab, which is focused on providing efficiency technology, specifically "Demand Response" (DR) for commercial and residential installation. DR is a concept that is designed to reduce end-user demand for electricity during shortages (hot summer weekday afternoons). That's when electricity is most expensive, and when brown-outs are most likely. By consistently curbing peak consumption during peak hours, the ISO (and utilities like PG&E that offer DR incentives & programs) helps reduce the need to build new generating plants that can cost millions. Consider the fact that, during the summer, power consumption roughly doubles from night-to-day. That's alot of expensive peak generation that's needed only a fraction of the time. And that's why participating in DR programs can generate cool, hard $ for end-users.

On exhibit in the lab were a number of "smart" residential & commercial technologies including programmable thermostats, appliances and building control systems that curb electrical consumption during DR events. Picture a smart building that dims perimeter lighting and reduces air conditioning when commanded; picture a home thermostat that reduces air conditioning by a few degrees when it receives a signal from its utility; picture a washer/dryer that delay their cycle until electric rates drop. All of these technologies are available today, but many are awaiting legislative approvals for utility programs that incentivize their use.

Now consider this: The "energy density" of an office building is under 10W per square foot. The energy density of a data center is over 100x of that. What would the possibilities be of bringing DR to a data center? Even a 5% reduction of a data center load could outstrip the DR savings of an entire office building. Think that this isn't possible? Between Dev/test/staging servers and failover servers, there are almost certainly 5% of servers that are "non-critical" and could be gracefully powered-down during the brief DR events.

What are the possibilities there?

Thursday, August 14, 2008

More vendors supporting Server Power Management

Bit-by-bit, it's becoming clearer that a major path to decreasing IT energy consumption has to do with Efficient Operation of equipment, not just with installing efficient equipment in-and-of-itself. Organizations that buy efficient servers, but don’t take intelligent operation into account, are the moral equivalent of buying compact fluorescent bulbs for your house, but never using the switches to turn off the lights.

In response, a number of vendors are now investigating the “efficient operations” issue. The concept has largely begun with desktop PC power management with companies like 1E with their NightWatchman product, and Verdiem with their Surveyor product. The companies are claiming over 500,000 seats under power control. Further, Verdiem announced Edison, a free consumer version.

But of more interest -- because more megawatts are involved -- are the products that power control servers in the data center. According to an EPA study based on IDC data, the average volume server consumes ~200W, mid-range server consumes 520W, and high-end server consuming a whopping 6,400W apiece. Finding ways to reduce consumption by even 5% yields a pretty big return.

Follows is a brief survey of the market for server power management products, where each fit, and my (admittedly biased) score.
  • Cassatt: Offering Active Response, Standard Edition. This is a policy-based approach to power-controlling just about any vendor make of server, including external PDUs; policies can be composed based on Time, Events, Capacity and server demand/load. Plus, server power-up/down is sequenced based on interdependencies & priorities. There is also a feature to allow it to interface to utility company "demand response" programs. This technology and a case study was displayed at a recent SVLG conference in Santa Clara, CA. Grade: A Why? Because it’s vendor neutral, works with virtual & physical apps, and provides any number of policies for energy savings

  • HP: Their Insight Power Manager is available for their ProLiant and Integrity servers. While specific to their hardware and management software, the product allows for real-time monitoring, power capping and CPU throttling. Grade: C+ Why? While their goal is noble, like most vendors they’re technology-specific, and provide limited control/management of total power. Try to use it to power manage your IBM bladecenter...
  • IBM: Much like HP, their PowerExecutive product. It’s available only for specific IBM BladeCenter and System x servers, and hooks into IBM Director. While it’s hardware-specific, it allows for real-time monitoring of power consumption. Then, their is their Active Energy Manager. While also IBM hardware specific, this allows for monitoring, capping, and to a certain degree, CPU power throttling. Grade: C+ Why? There’s really only limited capability here since you can only use it with enabled IBM systems, (sorry, HP) and even then, you have limited control over power consumption.
  • PowerAssure: This Silicon Valley startup has an offering that begins as a services engagements. Power Assure’s approach optimizes utilization by load shifting and load shedding, knowledge of power trends/costs and association of business and technical processes back to actual server use. I’ve not seen too much about how the service works or is priced, what technology they use, or what platforms they work with; but they’ve just received a new round of financing. Grade: Incomplete
  • Virtual Iron: This past week, VI announced its intent to release it’s “experimental” LivePower feature as part of its VM management package (keeping up with the Jones’… see VMware below). With LivePower, users can set polices that will shut down physical machines when there are no virtual machines running on the hardware. At the same time, if there is excessive CPU capacity, LivePower will be able to consolidate virtual machines onto fewer physical ones. Apparently, though, it has to use the Intel Node Manager, and it’s not clear (yet) how power will be physically controlled… probably with Wake on LAN. Grade: B Why? This is clearly an important feature, but it will be limited to one approach to power management (CPU utilization) and be available only for machines running VI’s suite.
  • VMware: For the past 6 months or so, VMware has also touted its “experimental” Distributed Power Management (DPM). Their execution is essentially identical to Virtual Iron’s, above (and, if imitation if the finest form of flattery, VMware should be flattered, given Virtual Iron’s product, above). VMware uses Wake on LAN to do its power control of idle hosts. Grade: B. Why? Same as above… what do you do if you have physical nodes not running VI3?
I'm pretty pleased that vendors are realizing that powering up/down servers is a smart/simple way to saving on wasted power, especially in environment with even a little cyclicality. And, as Virtual Iron pointed out in a recent release, even if you've already virtualized, you might be able to save another 25% off your power bill if you shut-down idle hosts. Food for thought, guys.

The next question: To initiate a consolidation project first, or a power-management project first?

Tuesday, August 5, 2008

A peek into the (dire) world of Managed Service Providers

The other day I was able to have a conversation with the COO as well as the SVP of Technology for a mid-market MSP/Hosting provider. Their situation was probably typical and telling of the problems most IT operators are facing.

They have a mid-sized data center; perhaps a third of their business is co-location, with the remaining business being hosted applications. They seem to have healthy growth, but have hit the limit on their UPS -- and have no more power capacity.

Naturally, I asked the question of whether they've virtualized/consolidated. No, they said; can't do it for the Co-Lo applications, and their hosted apps don't lend well to virtualization.

Next, I asked if they knew how much unused capacity they had on existing machines; perhaps idle machines could be power managed, freeing-up power capacity for other machines. They didn't know (but would get back to me)

Finally, I asked if they would consider a utility-computing infrastructure for their hosted-service machines (which makes the best possible use of capital and energy). No, they said, they use local storage, and believed that use of shared (i.e. SAN) storage was "too expensive".

Wow. Here I had a really great set of technologists, a growing business, and architectures that are mainstream -- but it's resulted in a siloed, inflexible and un-sharable infrastructure, where even the global utilization is unknown. They are very likely operating far below optimal energy efficiency (not to mention operational efficiency), and there they are - hitting the limits of their UPS. This is a perfect illustration of "when that next app costs you $million" because you need to build a new data center to hold it.

My take-aways from this experience:
  • Use more shared storage - it will ultimately give you a whole lotta flexibility
  • Measure and monitor your server use, as well as server utilization - look for patterns where you can share power and/or hardware
  • Look at your global capacity -- if your total capital efficiency is below 50-75% then you should consider sharing (using virtualization and/or a Utility Computing infrastructure)
  • Look at your PUE - if your overhead equipment (i.e. cooling) is inefficient, you can re-claim power for your IT equipment by reducing the consumption of overhead/facilities.

Thursday, June 26, 2008

Real data center efficiency project results

I spent the day at the SVLG data center energy summit, where 11 actual case studies were presented, each detailing how companies and their technology partners addressed energy efficiency, while quantifying the specific results. For all of the hubub with industry associations talking about theory, metrics, standards and efficiency, today marked the first time someone is actually doing something. And, representing Cassatt's efforts, I was happy to provide input and real-life user data as well.

We had about 300 people in the room, including press, analysts, industry and government. It was a full day of presentations and reviews of various types of projects that were undertaken, as well as what the outcomes were. The results given during the day were then collated by Teresa Tung of Accenture Technology Labs, and compared against the results posited by the 2007 EPA report to congress on data center energy efficiency. The results matched up quite well. (even Andrew Fanara, EPA Energy Star's project director, blew a sigh of relief that his report in fact matched reality).

The complete set of session reports, as well as the Accenture report, are already on the web for all to see and learn from. That others could learn from these pioneers was part of the goal of the day.

The first session of the day featured IT resource optimization. Synopsis outlined how they consolidated data centers and saved power, square feet and more. Cassatt (presented by yours truly) then described how Active Power Management helped a nearby company curb over 20% of their power bill with innovative power management software.

The day also had a number of sessions sponsored by Lawrence Berkeley Labs, Oracle, the USPS, Power Assure and others, focussing on air flow management, cooling, power distribution projects and more.

Over lunch, we were treated to a CIO panel that included Teri Takai, California's CIO -- overseeing more than 120 other CIOs of state agencies (how does it feel to be CIO for the earth's 7th largest economy?) plus PK Agarwal, California's CTO.

I also sat in on a session given by Dave Shroyer of NetApp, Bill Tschudi of Lawrence Berkeley National Labs, and Ray Pfeifer -- covering NetApp's ultra-efficient data centers. Dave pointed out that during certain seasons of the year, NetApp achieves a PUE of 1.19!! That's probably the best I've heard of ever.

Finally, at the end of the day, Accenture presented its report findings, summarizing the results of the 11 projects. Receiving the report were Andrew Fanara of the EPA, Paul Roggensack of the California Energy Commission, Paul Scheihing of the DOE, Bill Tschudi of Lawrence Berkeley labs, and Kevin Timmons of Yahoo. I suppose you could call this peer-review. But what it finally signals to the industry is that people are finally taking action, comparing reality against theory, and sharing their pragmatic best-practices. Crazy as this sounds, I feel it was a seminal event, and hope that other industry associations follow suit.

I'm sure you'll see additional coverage of this by other online folks I met there: Debra Grove of Grove Associates, as well as Rich Miller of Data Center Knowledge.

Wednesday, June 25, 2008

Energy, data centers, and the cloud

It's been a pretty information-loaded week regarding energy-management issues within the data center.

The first was the keynote Bill Coleman gave at O'Reilly's Velocity Conference earlier. He addressed why the current trends (point-products, resulting complexity) in data centers is unsustainable, and why economies-of-scale are declining. His answer: the cloud. He talks about 1.0 (where we are today), cloud 2.0 (more sophisticated, may even replace the PC), and 3.0 where it really represents the "webtone" of services available on-demand, reliable, and composable. And the more efficient these economies-of-scale become, the more energy efficient they become as well. DataCenter Knowledge covered that as well, with a few relevant pointers to boot.

The other nifty reference was on Microsoft's TechNet Magazine. There, Dave Ohara pointed out similar observations from a number of sources --- that turning off unused assets is a path to sustainable computing. He gave a few examples including

  • Weill Medical College's HPC clusters leveraging IPMI for node shut-down
  • Citrix' approach to using their PowerSmart utility to power-down idle HP-based presentation servers
  • Microsoft's "Power-Aware Server Provisioning and Load Dispatching for Connection-Intensive Internet Services"
  • Commercially-available solutions, such as Cassatt's
With this mounting set of options, will power management continue to gain in popularity?

Friday, June 6, 2008

Real-life data center efficiency projects!

It's about time the industry stopped talking about data center & IT energy efficiency, and started doing something.

The good news is the first wave of actual projects, metrics and results is about to be unveiled. The Silicon Valley Leadership Group (SVLG) is hosting their first Data Center Summit '08 in Santa Clara CA on June 26. The 1-day event will be co-sponsored by the California Energy Commission, the US DOE, and Lawrence Berkeley National Labs.

The summit will have 11 case studies of actual projects - each co-sponsored by the SVLG, but implemented by one or more silicon valley companies & technology vendors. Each project addresses a different aspect of data center energy efficiency - from power management to cooling improvements to server efficiency increases. The point being how we can show real progress, and share the data with others.
I believe that California's own CIO will be attending, various other officials, and possibly folks from the EPA as well.

Cassatt, I might add, will be co-presenting a real-life energy-saving project with a user of our Active Power Management technology.


Registration is a mere $295 - you can go to the SVLG website and sign up yourself.

Friday, May 30, 2008

More support for server power management

It was a great week for those endorsing the concept of actively-managing the power status of servers to drastically reduce data center power consumption.

First, Andy Lawrence with The 451 group outlined it as
... a technology that optimizes the energy efficiency of computers and other electronic devices by reducing power consumption to the lowest possible point while still supporting minimal agreed business or functional objectives. It does this by placing equipment or components into reduced power states according to policies and schedules or in response to a drop in machine utilization. It can also restore equipment to a fully functioning mode according to the same principles.
In one of his recent works, "Power management: a three-phased, multispeed market" that there are 3 waves of power management:

1) Enterprise Desktop power management
2) Datacenter/server power management
3) Integrated datacenter power distribution management
"Although this is a market in its infancy, [server] power management will be an important, if not critical, piece of the technological jigsaw, we believe, and one that needs to be in place to run an eco-efficient datacenter. Cassatt is one of a handful of companies making the early running. Cassatt Active Response 5.1 adds a critical on-demand capability that improves the business case for the technology.
Bridget Botelho in SearchDatacenter.com also managed to speak with a user of Cassatt's active response. The company began with a small environment of about eight devices, mostly servers. Once the use of Active Power Management was validated, the company increased to 40 devices, and now successfully runs Active Power Management on about 120 devices.

The global company has 5,000 racks of servers, most of them in Sunnyvale, Calif., and others located around the world. Prior to using Cassatt, the company had no way to manage system power, but the high cost of power in California and a sense of corporate responsibility prompted it to try Cassatt's software.

I really like the way the user (who shall remain nameless) endorses the concept (at right)

Wednesday, May 21, 2008

IT Automation & Power Mangement: a Synopsis of Recent Coverage

This week has seen an unusual share of coverage about IT energy issues - from a lot of different angles. However, whether or not "green" was stuck to the heading, everyone seems to agree that energy is a serious operational cost issue, and the bottom line for any energy-related initiative is always cost.

Grids & Power Management: Howard Marks of InformationWeek writes of his observation that in storage, MAID (Massive Arrays of Inactive Disks) regularly shuts down idle drives. And in grid arrays he's now seeing RAIN (Redundant Arrays of Independent Nodes) with a similar model -- essentially shutting down servers when not in use.

IT Energy Survey: Erin Bell of eChannelLine referenced a recent survey done by Cassatt regarding the degree of energy waste in data centers, and operators' willingness to look at power management as one option to curb it.

Automation = Efficiency: Gail Dutton in Virtual Strategy Magazine writes of the myth and realities of running a true "lights-out" data center, how automation plays a supporting role, and how various levels of efficiencies can be recovered by doing so... if management is willing to cede control.

Automation & Utility Computing: John Rath in the Data Center Links blog posted some humorous/insightful comments about the current reality of Utility Computing: "Myth? I don't think so. I think it is the early stages, but definitely not a myth.. I don't think utility computing, cloud computing, grid computing -- what ever you want to call it is a myth. Far from it. The applications of these technologies will be seen in different places, for different reasons and at different paces over the coming years." I couldn't agree with you more, John.

Curbing the Electric Consumption of Avatars: My buddy Dave Ohara on the Green Data Center Blog reminds us of Nicholas Carr's observation that the power consumption of a Second Life avatar is about that of a real-life Brazilian. Sort of tongue-in-cheek, but getting at the point that these computing environments numbering 1,000's of servers also need to be power-controlled during off-peak periods.

And finally,

It's about Efficient Operation, stupid: Arthur Cole of Data Center Central -- bless his heart -- finally implies the observation we've been pointing out for months: it's great to pursue efficient equipment to achieve IT energy efficiency, but to get the rest of the way, you need to pursue Efficient Operation of the equipment, too.

Monday, May 19, 2008

A big step forward for self-managing data centers

Today there is a modest but hugely-meaningful announcement regarding data center operational efficiency coming out of Cassatt here in San Jose. It's about Cassatt Active Response 5.1 software, and it includes the ability to take actions on infrastructure based on application demand. That means that server power control, or even entire server repurposing and network provisioning, can be triggered by the demand (or service level) of a given application.

This means that if you run a development lab, idled machines might be automatically power-down after a period of time (say, after a test run) to save power. It means that a server farm can automatically trigger provisioning additional servers if service levels drop below a pre-determined threshold - saving time. It means as different application demands ebb and flow, the data center will adapt to demand by re-purposing (or retiring) bare-metal hardware -- making the best use of capital. And all of this whether-or-not virtualization is present, regardless of the underlying platform, and without adding software layers.

You'll find this concept filed under Gartner's Real-Time Infrastructure (RTI) category, under Forrester's Organic IT concept, or sometimes under Utility Computing. You've even seen big vendors predicting it as a vision. But I'm happy to point out that we're doing some of it already today. Think of this as another step toward a greener data center, because it really optimizes all forms of operational and capital efficiency...

The simplest application of this Demand-Based Policy Management is with Active Power Management of data center servers to curb rampant power waste. (Check out Who's Recommending Power Management) The concept has been long-used on desktops (check out 1E or Verdiem; there are over a half-million desktops under power management today). In IT environments such as dev/test, we've seen opportunities to cut gross power consumption by 30% or more in a few months. All this by simply monitoring the server activity and then gracefully shutting-down idled hardware
(where idleness can be defined any way data center managers prefer). Check out the endorsements of power management from the EPA's Andrew Fanara as well as from Jon Koomey in the Cassatt press release. You can also watch a webcast about Active Power Management

A more sophisticated use of demand-based policy is to automatically maintain the service-level of applications. Take the server farm example... or for that matter, a SOA service. In either example, demand on the service may be cyclical or unpredicatable. Instead of massively over-provisioning hardware, one could use a service level metric (again, of your determination) to provide control. If service level drops (say, due to increased demand, or perhaps because of equipment failure) the Cassatt system will simply power-up or re-purpose another piece of hardware and create a new server to increase compute capacity. And you don' t need a virtualization platform to do this. (Or you could. Previously we announced compatibility with VMware ESX as well as with Xen.) Check out the 10 min webcast on demand-based policy management.

The benefits here are massive: Besides the power saved when not using a piece of equipment, you're maximizing the use of capital because it's dynamically repurposed. Similar control is used for Cloud Computing infrastructure like Amazon Web Services (AWS) and they've achieved a compute price-point unheard-of in the industry: $0.10 per CPU per hour. Try that with your existing infrastructure.

My, my. I've overlooked the remainder of the Cassatt announcement:
  • a new interface to interact with external systems - either management systems, or equipment like Load Balancers. Take the example of using an F5 load balancer in an environment with dynamic repurposing. As new servers are provisioned, Active Response can communicate in real-time to the balancer and provide the new VIPs in seconds as the servers are brought online.
  • a new set of platform compatibilities, including power distribution units, used to remotely power-manage servers. This is in addition to a massive list of supported hardware, OSs, applications and VM technologies. This solution will work with what you have today :)
If you want more info, go to the Cassatt website, or tune into some on-demand webcast presentations of the various Policy-Based controls for IT infrastructure.

Tuesday, April 22, 2008

Cassatt IT Energy Survey & Roundup

Today we at Cassatt announced our very comprehensive survey of IT energy Efficiency, and released a companion White Paper as well. Although I initially blogged about initial findings back in January, since then we've been doing analyses and going back to respondents and collecting 1st-hand 1:1 data and quotes that elaborate on the raw data. (I might add that excerpts of these interviews are included in the white paper).

The Survey was a really wide-ranging look at the IT industry - who's taking what initiatives, where are the industry pain-points, what sources of information are trusted, etc., and we found a few surprising data points as well. Such as
  • Where most enterprises go for "green" IT information may not be where you think
  • The degree of energy waste in different departments is more acute than you might believe
  • The willingness of some professionals to take new/different approaches to power management is more aggressive than we believed
More Surveys:
I've been spending time researching a number of other very excellent data center surveys being conducted, and you should look at them together to provide a rounded-out picture of the state-of-the-industry. Here goes:
One last note: a significant finding in our own survey was that most IT managers still turn to their equipment vendors for guidance on energy efficiency -- rather than to independent sources. So my final plea is that you look hard at the surveys, conclusions and recommendations that come from independent sources as much (or more) than the data that comes from the big vendors. Besides the surveys above, fantastic work is also coming out of The Green Grid, The Uptime Institute, as well as from the EPA.

Monday, April 14, 2008

1,000+ servers, and hitting the power ceiling

I've had a number of conversations with a really insightful Architect with a major healthcare provider. He runs over 1,000 servers (each, I might add, consuming 200+ Watts) to deliver applications to hospital desktops/kiosks. On top of what he's using, he's got a built-in 15% buffer for peaks & failures. Oh -- and did I mention a remote failover site where this configuration is essentially duplicated?

And here's the kicker: He knows that during nights/weekends, user demand drops off precipitously.

Conventional wisdom has it that *all* of these servers should be on and ready 100% of the time. Hmmm. That's 400,000W (think 400 blow driers) and probably another 400,000W or so to keep them cool.

Fortunately, our friend realizes that even during peak hours, not all of these servers need to be on... and off-peak, many fewer. What he *does* need is to ensure availability -- that at any time he has headroom for a momentary peak, and that he can bring on more at a rate that keeps up with demand.

This is not a solution that virtualization, or more efficient power supplies can impact; but by breaking with conventional wisdom and power controlling the servers based on usage/demand, we hope that his organization will save $$ and even regain precious power/cooling headroom.

Monday, March 17, 2008

Comprehensive Slide Decks on Energy-Efficient Computing

This very cool e-book by Matt Stansberry on TechTarget's SearchDataCenter covers green computing and data center energy efficiency -- and explains the forces driving IT energy consumption, why you should care, and how you can mitigate the problem.

In particular the 5th installment really sums things up:

Chapter 5: A step-by-step guide to greening the data center

The previous four chapters of this data center efficiency eBook laid out the case for going green in the data center and the tactics to achieve energy efficiency across the server, storage and infrastructure environments. This final chapter helps IT managers pull it all together and execute on a data center efficiency project, step-by-step.

  • Step 1: Convince the C-Suite to pursue energy efficiency. How much do you spend on energy now? How soon will you have to build a new data center to keep up with your company's growth? Use that information to get a mandate to pursue efficiency from the C-Level executives.
  • Step 2: Measure data center energy consumption. Set up a simple metric like Power Usage Effectiveness to get a baseline of how much power is going to the servers and how much is being lost on cooling and infrastructure. Set goals to improve the ratio.
  • Step 3: Get started with IT asset management. Tackle IT inefficiencies by consolidating applications, deleting deadweight servers, implementing active power saving features and specifying energy efficient hardware.
  • Step 4: Tackle facility fundamentals. Implement hot-aisle/cold-aisle, seal up that floor, raise the voltage on your PDUs from 120 to 208 and take advantage of free cooling when available.
There are also some very clear operational recommendations regarding power management, as well as "active power myths" that dispel the traditional objections to certain operational conducts.

Tuesday, February 5, 2008

Green Grid Technical Forum: Day #1

Since Cassatt is a new General Member to the Green Grid, I was able to attend this 2-day meeting. Today's session was quite well-attended... I estimate ~ 300+ participants in the room here in San Francisco for the opening talks and panels. Today/tomorrow appear to be engineered for members (and the press) as a comprehensive report-out of the excellent machinations of the organization and its workgroups.

The morning opened with some end-users (data center operators) such as Enterprise Rent-a-Car and AllState Insurance talking about comprehensive steps they took (and are still taking) to radically shift the efficiency of their operations. (I might interject that one of the strategies Allstate takes is to power-down idle equipment...)

But what was really interesting in the morning were a number of panels covering how the organization is reaching-out to other orgs and to government; panels featured Andrew Fanara of the EPA's EnergyStar program, Paul Sheihing of the DOE's Save Energy Now program, and Anson Wu who's helping develop the EU's CoC (Code of Conduct, roughly analogous to EnergyStar). A number of other organizations, such as Lawrence Berkeley National Labs were also present. It's good to see this degree of cooperation, but what was still left unsaid was specifically how these groups were specifically cooperating. Perhaps one answer lay in the fact that the Green Grid was still spinning-up liaison work groups -- but it's certainly on their radar.

Also really neat was the fact that EnergyStar will be creating a rating system for Data Centers, the same way that they have a rating for buildings, and that DOE will be creating an efficiency diagnostic/assessment tool ("DC-Pro") for Data Centers the same way they have tools for, say, chemical plants.

Also of special note were a number of talks having to do with metrics. Every org has them, and even more are being developed. There's alphabet soup like PUE, DCiE, DCP, SI-POM and DH-UE. In fact, nearly every organization above is proposing metrics to help characterize data center power consumption and efficiency. Finally, the question was asked regarding how to sort through who's creating what metric. I think that's one of the pivotal points -- what will be the generally-accepted set of metrics to use when assessing the efficiency of a data center? Hmmm. Maybe we'll find out on Day #2...

Monday, February 4, 2008

Huge Power Inefficiencies in Dev/Test Labs

Last week I was able to meet with the Director of Global Lab Services for a major networking company. We had a wide-ranging conversation, but here is an insightful summary that continues to reinforce my power management thesis:
  • Company divisions are moving to individual P&L's (with chargebacks) and are under pressure to ID and eliminate wasteful costs
  • He's overseeing the use of thousands of pieces of hardware (servers, switches, routers), being used by roughly 500 engineers (many overseas in India). Many of these pieces consume over 1kW each.
  • Lab hardware is constantly being reserved for test-beds, checked-out, and then returned to unreserved status. But it's clear that even when a piece of hardware is part of a test-bed, it may be un-used for as much as 50% of the time.
  • In labs alone, the company is paying nearly $100k per month in electricity bills
  • He knows that there are massive power inefficiencies, and is looking for a solution.
Now, this company is not even on the Fortune 500 list (although on the F1000 list).... which says to me that there are probably hundreds of other enterprises facing the same problem. So as the industry focuses on "green data centers," virtualization and cooling technologies, *why* don't we simply look at the use rates (some would day the duty cycles) of the equipment itself? Simply using Active Power Management ought to be a quick/easy solution right off the bottom line.

And what better place to begin than in Dev/Test?




Wednesday, January 23, 2008

Dynamic Data Center, Dynamic Metrics

I'm happy to see that the Green Data Center Blog points out that data center efficiency metrics like PUE (Power Usage Effectiveness) need to be necessarily dynamic if/when the data center is dynamic:
"I've been meaning to write about PUE, and have been stumped in that It is defined as a metric, and in the Green Grid document referenced it makes no reference that is dynamic. In reality PUE will be a dynamic # that changes as the load changes in a room. How ironic would it be that your best PUE # is when all the servers are running at near capacity, and shutting down servers to save power will [actually] increase your PUE?
A broader explanation of Assessing the New Data Center Metrics is on an earlier entry.

If you look at Gartner's description of "Real-Time Infrastructure" (RTI), IDC's "Dynamic IT" or Forrester's "Organic IT" concept, they all point to evolutionary steps where data centers will adapt/respond to demand by re-purposing equipment in real-time. As this happens, the metrics that will define efficiency will need to track this as well.